- Add comprehensive health check system with multiple endpoints - Add Prometheus metrics endpoint - Add production logging configurations (5 strategies) - Add complete deployment documentation suite: * QUICKSTART.md - 30-minute deployment guide * DEPLOYMENT_CHECKLIST.md - Printable verification checklist * DEPLOYMENT_WORKFLOW.md - Complete deployment lifecycle * PRODUCTION_DEPLOYMENT.md - Comprehensive technical reference * production-logging.md - Logging configuration guide * ANSIBLE_DEPLOYMENT.md - Infrastructure as Code automation * README.md - Navigation hub * DEPLOYMENT_SUMMARY.md - Executive summary - Add deployment scripts and automation - Add DEPLOYMENT_PLAN.md - Concrete plan for immediate deployment - Update README with production-ready features All production infrastructure is now complete and ready for deployment.
9.3 KiB
9.3 KiB
Production Deployment Prerequisites Checklist
Vollständige Checkliste für Production Deployment des Custom PHP Frameworks.
✅ Server Requirements
Hardware Minimum
- CPU: 2 Cores minimum, 4+ recommended
- RAM: 4GB minimum, 8GB+ recommended
- Storage: 50GB SSD minimum, 100GB+ recommended
- Network: Static IP address
- Bandwidth: 100 Mbit/s minimum
Operating System
- OS: Ubuntu 22.04 LTS or Debian 12
- User: Non-root user with sudo privileges
- SSH: Key-based authentication configured
- Firewall: UFW or iptables configured
DNS Configuration
- Domain registered and DNS configured
- A record pointing to server IP
- AAAA record for IPv6 (optional)
- CAA record for SSL certificate authority
✅ Software Prerequisites
Docker Installation
- Docker Engine 24.0+ installed
- Docker Compose V2 installed
- Docker user group configured
- Docker daemon running on boot
# Install Docker
curl -fsSL https://get.docker.com | sh
sudo usermod -aG docker $USER
newgrp docker
# Verify installation
docker --version
docker compose version
System Packages
gitinstalledmakeinstalledcurlorwgetinstalledufwfirewall installed
sudo apt update
sudo apt install -y git make curl ufw
✅ Security Prerequisites
SSL/TLS Certificates
- Domain ownership verified
- Port 80 (HTTP) accessible for ACME challenge
- Port 443 (HTTPS) open in firewall
- Let's Encrypt rate limits understood
Firewall Configuration
- Port 22 (SSH) - Restricted to known IPs
- Port 80 (HTTP) - Open for ACME challenge & redirect
- Port 443 (HTTPS) - Open for production traffic
- All other ports closed by default
# UFW Configuration
sudo ufw default deny incoming
sudo ufw default allow outgoing
sudo ufw allow 22/tcp # SSH (restrict to your IP)
sudo ufw allow 80/tcp # HTTP
sudo ufw allow 443/tcp # HTTPS
sudo ufw enable
SSH Hardening
- Password authentication disabled
- Root login disabled
- SSH key authentication only
- Fail2ban or similar installed
# /etc/ssh/sshd_config
PasswordAuthentication no
PermitRootLogin no
PubkeyAuthentication yes
✅ Environment Configuration
Environment Variables
.env.productioncreated (see template below)- Database credentials configured
- Redis password set
- Vault encryption keys generated
- OAuth credentials configured (if needed)
- API keys configured (if needed)
Secrets Management
VAULT_ENCRYPTION_KEYgenerated (32 bytes, base64)STATE_ENCRYPTION_KEYgenerated (32 bytes, base64)- Keys stored securely (not in git)
- Backup encryption key stored separately
# Generate encryption keys
php -r "echo base64_encode(random_bytes(32)) . PHP_EOL;"
✅ Database Prerequisites
PostgreSQL Configuration
- Database user created with strong password
- Database created with UTF8 encoding
- Connection pool limits configured
- Backup strategy defined
postgresql.production.confconfigured
Database Migrations
- All migrations tested in staging
- Migration rollback plan prepared
- Database backup before migration
- Migration execution script ready
✅ Application Prerequisites
Code Repository
- Production branch created
- Latest stable code pushed
- Git hooks configured (if needed)
.gitignoreproperly configured
Composer Dependencies
- Production dependencies only (
--no-dev) - Autoloader optimized (
--optimize-autoloader) - Classmap authoritative (
--classmap-authoritative) - Composer version 2.x installed
PHP Configuration
- OPcache enabled and configured
- Memory limits appropriate (512M+)
- Error reporting disabled in production
- Log rotation configured
✅ Docker Configuration
Images & Builds
docker/nginx/Dockerfile.productionexistsdocker/php/Dockerfile.productionexistsdocker/worker/Dockerfile.productionexists- Production PHP configuration files ready
- Nginx production configuration ready
Volumes & Persistence
- Database volume strategy defined
- Redis persistence configured
- Log storage strategy defined
- Backup storage configured
- File upload storage configured
Networks & Security
- Backend network set to internal-only
- Cache network set to internal-only
- Frontend network properly exposed
- Container security options configured
✅ Monitoring & Logging
Logging Configuration
- Log aggregation strategy defined
- Log rotation configured
- Error notification configured
- Access logs configured
Monitoring Setup
- Health check endpoints configured
- Uptime monitoring configured
- Performance metrics collection
- Alert thresholds defined
Backup Strategy
- Database backup frequency defined (daily recommended)
- Backup retention policy defined (30 days recommended)
- Backup encryption configured
- Backup restoration tested
- Off-site backup storage configured
✅ Deployment Automation
Deployment Scripts
deploy.shscript created- Zero-downtime deployment strategy
- Rollback script prepared
- Health check validation
- Post-deployment tests defined
CI/CD Pipeline (Optional)
- GitHub Actions / GitLab CI configured
- Automated tests on push
- Automated deployment to staging
- Manual approval for production
- Deployment notifications
✅ Performance Optimization
PHP Optimizations
- OPcache validate_timestamps=0
- OPcache preloading configured (optional)
- JIT enabled (PHP 8.4)
- Memory limits tuned
- Execution timeouts configured
Database Optimizations
- Connection pooling configured
- Query optimization completed
- Indexes properly configured
- VACUUM strategy defined
- Statistics collection configured
Caching Strategy
- Redis persistence configured (AOF + RDB)
- Cache warming strategy defined
- Cache invalidation strategy defined
- Cache monitoring configured
CDN & Assets (Optional)
- Static assets minified
- Asset versioning configured
- CDN configured (if applicable)
- Image optimization configured
✅ Documentation
Required Documentation
- Deployment procedure documented
- Rollback procedure documented
- Disaster recovery plan documented
- Architecture diagram created
- Runbook for common issues
Team Knowledge
- Team trained on deployment process
- Access credentials shared securely
- On-call rotation defined
- Escalation procedures defined
✅ Testing & Validation
Pre-Deployment Testing
- All unit tests passing
- Integration tests passing
- E2E tests passing (if applicable)
- Load testing completed
- Security scan completed
Staging Environment
- Staging environment mirrors production
- Deployment tested on staging
- Performance tested on staging
- SSL certificates tested on staging
Post-Deployment Validation
- Health check endpoints responding
- SSL certificate valid
- Database connections working
- Redis connections working
- Queue workers running
- Scheduled tasks running
- Monitoring alerts functional
✅ Final Checklist Before Go-Live
Critical Path
- Backup current data (if migrating)
- DNS TTL lowered (24h before)
- Maintenance page ready
- Team notified and available
- Rollback plan reviewed
Go-Live Steps
- Enable maintenance mode
- Pull latest production code
- Run database migrations
- Build and start containers
- Verify health checks
- Update DNS records (if new server)
- Monitor for 30 minutes
- Disable maintenance mode
- Announce deployment
Post Go-Live Monitoring
- Monitor error logs (30 min)
- Check performance metrics (1 hour)
- Verify all services running (2 hours)
- Review user feedback (24 hours)
⚠️ Emergency Contacts
Critical Issues
- Emergency contact list prepared
- Hosting provider support number
- Database administrator contact
- Senior developer on-call
📋 Environment-Specific Checklists
Staging Environment
- All prerequisites met
- Deployment tested successfully
- Performance acceptable
- No critical bugs
Production Environment
- All prerequisites met
- Staging tests passed
- Backup and rollback tested
- Team approval obtained
Next Steps
After completing this checklist:
- Create
.env.production- Seedocs/deployment/env-production-template.md - Configure SSL Certificates - See
docs/deployment/ssl-setup.md - Run Deployment Script - See
scripts/deploy-production.sh - Verify Health Checks - See
docs/deployment/health-checks.md - Monitor Logs - See
docs/deployment/monitoring.md
Additional Resources
- Deployment Guide:
docs/deployment/deployment-guide.md - Troubleshooting:
docs/deployment/troubleshooting.md - Rollback Guide:
docs/deployment/rollback-guide.md - Security Hardening:
docs/deployment/security-hardening.md